- Does it need permission at all? Some work is not development, and some is permitted development under the 2015 order. Check this first, because the answer may save you an application. If in doubt, a certificate of lawfulness of proposed use or development gives you a formal answer.
- Which council, and which plan? Find out whether your council has adopted a Plan Strategy. If it has, its own policies decide the application. If not, the regional Planning Policy Statements still do. Our guide on which plan applies sets this out.
- Is the site inside a settlement limit? The area plan map shows the boundary of each town and village. Inside it, the starting point is generally more positive. Outside it, you are in the countryside and only certain types of development are acceptable.
- Is there a designation on or near the site? Look for conservation areas, listed buildings, areas of townscape character, Areas of Outstanding Natural Beauty, local landscape policy areas, nature designations and archaeological sites. Each brings extra tests.
- What is the planning history? Search the site and the land around it. Earlier refusals tell you what the council objected to. Earlier approvals may come with conditions that still bind the property, including ones that remove permitted development rights.
- Can you get a safe access? For new houses and businesses, DfI Roads will want visibility splays of a set length in each direction. Hedges and land you do not own can stand in the way. This single issue defeats many rural schemes.
- Where will the water go? Is there a mains sewer? If not, will the ground take a septic tank or treatment plant and soakaway? Is any part of the site in a flood plain, or likely to need a drainage assessment?
- Who owns what? You must certify ownership on the application form and serve notice on any other owners. Access over a lane or a third party’s land needs to be resolved, even if planning does not decide private rights.
- What will the neighbours see? Think about overlooking, loss of light and the sense of being hemmed in. Talking to neighbours early can head off objections, or at least tell you what they will be.
- Which reports will the council want? Depending on the site this might be a biodiversity checklist and ecology survey, a tree survey, a heritage statement, a flood risk assessment, or a design and access statement. Commissioning them before submission avoids delays after.
When to bring in help
If the answers to questions 1 to 4 are clear and positive, a straightforward project may need little more than good drawings. If any of them is uncertain, or the site is in the countryside, a professional view at this stage is usually money well spent. Get in touch with the address and we will tell you what we see.