Key facts: Derry City and Strabane
- Decided by
- Derry City and Strabane District Council (planning pages)
- Planning office
- 98 Strand Road, Derry~Londonderry BT48 7NN
- Where applications go
- the NI Planning Portal
- Plan in force
- Plan Strategy 2032, adopted July 2025 (checked 13 November 2026)
- Typical decision time
- 17.3 weeks (median, local applications, April–June 2026); 41.8% decided inside the 15-week target
The plan in force
The Local Development Plan 2032 Plan Strategy was adopted on 10 July 2025, after independent examination and a direction from the Department to adopt it with modifications. The regional Planning Policy Statements no longer apply in the district. The Local Policies Plan has not been adopted, so the Derry Area Plan 2011 and the Strabane Area Plan 1986–2001 still matter for zonings and designations.
Policies that come up most
- HOU 10 for residential extensions and alterations.
- HOU 13 for HMO management areas, with a percentage cap inside designated areas and a 10% limit on the street outside them.
- HOU 14 for HMO design, which limits the size of each unit and requires a minimum floor area where a house is split.
- HOU 18 to HOU 26 for housing in the countryside, from farm dwellings to clusters and small gap sites. HOU 23 allows a single dwelling in a small gap (and a single dwelling in a larger gap only in parts of the Sperrin AONB). There is no infill in the Green Belt.
- HE 3 to HE 6 for the historic environment, including development next to the City Walls.
- NE 5 in the Sperrin Area of Outstanding Natural Beauty.
Typical work
Student and shared housing near the university, extensions in the city’s suburbs, replacement and farm dwellings in the rural areas around Strabane, Claudy and Eglinton, and alterations within the walled city and its conservation area. Decision times have fallen sharply, from a median of 34.5 weeks in April to June 2025 to 17.3 weeks in the same quarter of 2026.
The planning office is at 98 Strand Road, Derry~Londonderry.
Decision times in Derry City and Strabane, in numbers
Between April and June 2026 the council issued 114 decisions on local applications, and 99% of those were approvals. Half of them took longer than 17.3 weeks from a valid application (a year earlier the figure was 34.5 weeks, and for 2025/26 as a whole it was 25.2). These are Department for Infrastructure figures and describe all local applications, not any one type.
Source: DfI Northern Ireland planning statistics, April–June 2026 bulletin.
What happens when you get in touch
- You send the address
A postcode or a pin on a map is enough, with a line on what you want to do.
- We look it up
Planning history, the plan that applies, and anything on or near the site that could matter.
- You get a straight answer
Whether it needs permission, how strong it looks, and what would help.
- If you go ahead
We can prepare the drawings, reports and forms and lodge the application for you.
- Until the decision
We answer the case officer and consultees and tell you what is happening.
Planning advice in Derry City and Strabane
Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.