Planning Advice in Newry, Mourne and Down

This council has the longest decision times in Northern Ireland at present, so a complete, well-argued application matters even more here than elsewhere.

Key facts: Newry, Mourne and Down

Decided by
Newry, Mourne and Down District Council (planning pages)
Planning office
Haughey House, Unit 19 Rampart Road, Greenbank Industrial Estate, Newry BT34 2QU
Where applications go
the NI Planning Portal
Plan in force
Draft Plan Strategy only; the 2015 area plans and the PPSs still decide applications (checked 13 November 2026)
Typical decision time
45.8 weeks (median, local applications, April–June 2026); 4.3% decided inside the 15-week target

The plan in force

Newry, Mourne and Down published its draft Plan Strategy on 27 June 2025 and has not adopted it. It consulted on focused changes from 26 October to 21 December 2026, ahead of independent examination. Until adoption, applications are assessed against the Strategic Planning Policy Statement, the retained Planning Policy Statements and two area plans: the Banbridge, Newry and Mourne Area Plan 2015 for Newry, south Armagh and Mourne, and the Ards and Down Area Plan 2015 for the former Down district, including Downpatrick, Newcastle, Ballynahinch and Lecale.

Policies that come up most

  • PPS 21, especially CTY 3 replacements, CTY 8 infill, CTY 10 farm dwellings and the integration and rural character tests in CTY 13 and CTY 14.
  • PPS 2 Policy NH 6. The district contains three Areas of Outstanding Natural Beauty: Mourne, Ring of Gullion, and Strangford and Lecale.
  • PPS 7 Addendum Policy EXT 1 for house extensions.
  • PPS 6 for heritage, and PPS 16 for tourism proposals, which are common around Newcastle and the Mournes.

Working with long decision times

In April to June 2026 the median time for a local decision here was over 45 weeks, against a target of 15. That makes it doubly important to get the application right first time, because an amendment or a missing report can add months. We front-load the work: the reports the case officer is likely to ask for are prepared before submission, and access and visibility are designed with DfI Roads standards in mind.

The planning office is at Haughey House, Rampart Road, Greenbank, Newry.

Decision times in Newry, Mourne and Down, in numbers

Between April and June 2026 the council issued 286 decisions on local applications, and 92% of those were approvals. Half of them took longer than 45.8 weeks from a valid application (a year earlier the figure was 46.1 weeks, and for 2025/26 as a whole it was 45.8). These are Department for Infrastructure figures and describe all local applications, not any one type.

Source: DfI Northern Ireland planning statistics, April–June 2026 bulletin.

What happens when you get in touch

  1. You send the address

    A postcode or a pin on a map is enough, with a line on what you want to do.

  2. We look it up

    Planning history, the plan that applies, and anything on or near the site that could matter.

  3. You get a straight answer

    Whether it needs permission, how strong it looks, and what would help.

  4. If you go ahead

    We can prepare the drawings, reports and forms and lodge the application for you.

  5. Until the decision

    We answer the case officer and consultees and tell you what is happening.

Planning advice in Newry, Mourne and Down

Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.

Not sure where you stand?

Tell us where the site is and what you would like to build or change. We will give you a straight answer on the planning position before you commit to anything.

☎ Ring us028 9591 6888 ✉ Emailinfo@ Ask usenquiry form