Key facts: Antrim and Newtownabbey
- Decided by
- Antrim and Newtownabbey Borough Council (planning pages)
- Planning office
- Planning Section, Mossley Mill, Carnmoney Road North, Newtownabbey BT36 5QA
- Where applications go
- the NI Planning Portal
- Plan in force
- Plan Strategy 2030, adopted July 2025 (checked 13 November 2026)
- Typical decision time
- 11.4 weeks (median, local applications, April–June 2026); 63.6% decided inside the 15-week target
The plan in force
Local Development Plan 2030 Plan Strategy was adopted on 3 July 2025 and the regional Planning Policy Statements no longer apply in the borough. The Local Policies Plan has not been adopted, so zonings and settlement limits come from the Antrim Area Plan 1984–2001 in the former Antrim district and, in Metropolitan Newtownabbey, from the Belfast Urban Area Plan 2001, with draft BMAP a material consideration.
Policies that come up most
- DM 22 for residential extensions and alterations.
- DM 18 for homes in the countryside, with separate parts for farm dwellings (DM 18A), replacements (DM 18B), built-up frontages (DM 18C: up to two dwellings, generally a frontage of at least five substantial buildings including three dwellings, and a gap no more than 60m), clusters (DM 18D) and conversions (DM 18F).
- DM 17 for new homes within settlements.
- DM 25, DM 27 and DM 28 on urban design, rural character and amenity.
- DM 13 near Belfast International Airport, where safeguarding can affect height and use.
Farm dwellings under DM 18A
The farm business must have been active and established for at least six years, no dwellings or development opportunities can have been sold off the holding in the previous ten years, and the new house should cluster with an established group of farm buildings. A farm can only use this route once every ten years. We check these points with you before any drawing is prepared, because they are where most farm applications fall down.
Typical work
Extensions in Glengormley, Jordanstown and Ballyclare, replacement dwellings and farm sites in the rural west of the borough around Randalstown and Toome, and commercial proposals near the airport and the M2 corridor. The planning section is at Mossley Mill.
Decision times in Antrim and Newtownabbey, in numbers
Between April and June 2026 the council issued 138 decisions on local applications, and 94% of those were approvals. Half of them took longer than 11.4 weeks from a valid application (a year earlier the figure was 10.4 weeks, and for 2025/26 as a whole it was 13). These are Department for Infrastructure figures and describe all local applications, not any one type.
Source: DfI Northern Ireland planning statistics, April–June 2026 bulletin.
What happens when you get in touch
- You send the address
A postcode or a pin on a map is enough, with a line on what you want to do.
- We look it up
Planning history, the plan that applies, and anything on or near the site that could matter.
- You get a straight answer
Whether it needs permission, how strong it looks, and what would help.
- If you go ahead
We can prepare the drawings, reports and forms and lodge the application for you.
- Until the decision
We answer the case officer and consultees and tell you what is happening.
Planning advice in Antrim and Newtownabbey
Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.