Key facts: Causeway Coast and Glens
- Decided by
- Causeway Coast and Glens Borough Council (planning pages)
- Planning office
- Cloonavin, 66 Portstewart Road, Coleraine BT52 1EY
- Where applications go
- the NI Planning Portal
- Plan in force
- No Plan Strategy published yet; Northern Area Plan 2016 and the PPSs apply (checked 13 November 2026)
- Typical decision time
- 20.8 weeks (median, local applications, April–June 2026); 33.5% decided inside the 15-week target
The plan in force
Causeway Coast and Glens has not adopted a Plan Strategy and, when we checked on 13 November 2026, had not published a draft. Its timetable points to a draft in late 2026. Applications are decided against the Northern Area Plan 2016, adopted in September 2015, together with the Strategic Planning Policy Statement and the retained Planning Policy Statements.
Policies that come up most
- PPS 21 for countryside housing, with CTY 13 and CTY 14 often decisive in open coastal and upland landscapes.
- PPS 2 Policy NH 6. Four Areas of Outstanding Natural Beauty touch the borough: Causeway Coast, Antrim Coast and Glens, Binevenagh and the Sperrins.
- PPS 6, including the setting of the Giant’s Causeway and Causeway Coast World Heritage Site.
- PPS 16 on tourism, and the Northern Area Plan’s own landscape and coastal designations.
- PPS 7 Addendum Policy EXT 1 for extensions.
Holiday homes and short lets
Second homes are a long-standing concern in Portrush, Portstewart, Castlerock and Ballycastle, but the Northern Area Plan 2016 has no policy that restricts them. The exception is Rathlin Island, where Policy COU 1 limits new dwellings to permanent residents. Whether letting a house to visitors needs permission depends on how intensively it is let, and Tourism NI certification is a separate requirement.
The planning office is at Cloonavin, 66 Portstewart Road, Coleraine.
Decision times in Causeway Coast and Glens, in numbers
Between April and June 2026 the council issued 189 decisions on local applications, and 93% of those were approvals. Half of them took longer than 20.8 weeks from a valid application (a year earlier the figure was 23 weeks, and for 2025/26 as a whole it was 18.2). These are Department for Infrastructure figures and describe all local applications, not any one type.
Source: DfI Northern Ireland planning statistics, April–June 2026 bulletin.
What happens when you get in touch
- You send the address
A postcode or a pin on a map is enough, with a line on what you want to do.
- We look it up
Planning history, the plan that applies, and anything on or near the site that could matter.
- You get a straight answer
Whether it needs permission, how strong it looks, and what would help.
- If you go ahead
We can prepare the drawings, reports and forms and lodge the application for you.
- Until the decision
We answer the case officer and consultees and tell you what is happening.
Planning advice in Causeway Coast and Glens
Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.