Key facts: Lisburn and Castlereagh
- Decided by
- Lisburn and Castlereagh City Council (planning pages)
- Planning office
- Planning Unit, Lagan Valley Island, The Island, Lisburn BT27 4RL
- Where applications go
- the NI Planning Portal
- Plan in force
- Plan Strategy 2032, adopted September 2023 (checked 13 November 2026)
- Typical decision time
- 18.3 weeks (median, local applications, April–June 2026); 45.6% decided inside the 15-week target
The plan in force
The council adopted its Local Development Plan 2032 Plan Strategy on 26 September 2023, with its operational policies in Part 2. The regional Planning Policy Statements no longer apply here. The Local Policies Plan has not yet been published, so zonings and designations are still read from the older maps: the Lisburn Area Plan 2001, the Lagan Valley Regional Park Local Plan 2005 and, in the former metropolitan Castlereagh area around Dundonald and Carryduff, the Belfast Urban Area Plan 2001, with draft BMAP a material consideration.
Countryside policy
New houses outside settlements are tested under policies COU1 to COU16. COU1 is the gateway, listing the types of development that may be acceptable. Clusters fall under COU2, replacements under COU3, infill under COU8 (up to two dwellings in a gap within a frontage of at least four buildings, two of them dwellings) and farm dwellings under COU10, with COU15 and COU16 covering integration and rural character. The structure will be familiar to anyone who knows PPS 21, but the wording has changed in places, so older refusals and approvals are not a reliable guide.
Typical work in the district
We see a steady flow of extensions in Lisburn city and the Castlereagh suburbs, replacement dwellings and farm sites in the rural area around Moira, Glenavy and Hillsborough, and proposals affected by the Lagan Valley Regional Park, where landscape protection weighs heavily. Hillsborough’s conservation area brings closer scrutiny of materials and detail.
Decision times have improved markedly: the median in April to June 2026 was well under half the figure for the same quarter a year earlier. The planning unit is based at Lagan Valley Island in Lisburn.
Decision times in Lisburn and Castlereagh, in numbers
Between April and June 2026 the council issued 165 decisions on local applications, and 96% of those were approvals. Half of them took longer than 18.3 weeks from a valid application (a year earlier the figure was 48 weeks, and for 2025/26 as a whole it was 29.4). These are Department for Infrastructure figures and describe all local applications, not any one type.
Source: DfI Northern Ireland planning statistics, April–June 2026 bulletin.
What happens when you get in touch
- You send the address
A postcode or a pin on a map is enough, with a line on what you want to do.
- We look it up
Planning history, the plan that applies, and anything on or near the site that could matter.
- You get a straight answer
Whether it needs permission, how strong it looks, and what would help.
- If you go ahead
We can prepare the drawings, reports and forms and lodge the application for you.
- Until the decision
We answer the case officer and consultees and tell you what is happening.
Planning advice in Lisburn and Castlereagh
Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.