Key facts: Fermanagh and Omagh
- Decided by
- Fermanagh and Omagh District Council (planning pages)
- Planning office
- County Buildings, 15 East Bridge Street, Enniskillen BT74 7BW
- Where applications go
- the NI Planning Portal
- Plan in force
- Plan Strategy 2030, adopted March 2023 (checked 13 November 2026)
- Typical decision time
- 8.4 weeks (median, local applications, April–June 2026); 69.3% decided inside the 15-week target
The plan in force
The Local Development Plan 2030 Plan Strategy was adopted on 16 March 2023. The regional Planning Policy Statements no longer apply in the district. The Local Policies Plan has not been published yet, so the Fermanagh Area Plan 2007 and the Omagh Area Plan 1987 – 2002 remain relevant for some designations.
Policies that come up most
- HOU11 for a dwelling on a farm, which needs a business that has been active and established for at least six years.
- HOU08 and HOU09 for replacement dwellings and buildings.
- HOU13 for rounding off and infilling, which allows up to two dwellings in a gap within a frontage of at least three buildings.
- HOU15 for houses justified by special personal or domestic circumstances.
- DE01 to DE03 for design, and L01 to L03 for landscape. Expect to need a landscape and visual impact assessment for a site in the Sperrins AONB or a Special Countryside Area, and for bigger schemes in an Area of High Scenic Value.
- HE01 to HE08 for the historic environment.
Rural work
This is a largely rural district, so farm dwellings, replacements and conversions make up much of our work here. Lakeshore sites around Lough Erne and upland sites in the Sperrins bring landscape issues to the fore. The council publishes a validation checklist, and an application that does not meet it can be returned, so we prepare against it from the start.
The median decision time was 8.4 weeks in April to June 2026, the fastest in Northern Ireland. The planning office is at County Buildings, 15 East Bridge Street, Enniskillen.
Decision times in Fermanagh and Omagh, in numbers
Between April and June 2026 the council issued 182 decisions on local applications, and 96% of those were approvals. Half of them took longer than 8.4 weeks from a valid application (a year earlier the figure was 7.6 weeks, and for 2025/26 as a whole it was 7.6). These are Department for Infrastructure figures and describe all local applications, not any one type.
Source: DfI Northern Ireland planning statistics, April–June 2026 bulletin.
What happens when you get in touch
- You send the address
A postcode or a pin on a map is enough, with a line on what you want to do.
- We look it up
Planning history, the plan that applies, and anything on or near the site that could matter.
- You get a straight answer
Whether it needs permission, how strong it looks, and what would help.
- If you go ahead
We can prepare the drawings, reports and forms and lodge the application for you.
- Until the decision
We answer the case officer and consultees and tell you what is happening.
Planning advice in Fermanagh and Omagh
Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.