If permission was granted
The time limit. The first condition usually sets the deadline to begin. For a full permission it is normally five years. For outline permission there are separate deadlines for reserved matters and for starting work.
Conditions to discharge before work starts. Some conditions require details to be submitted and approved before any work begins: materials, landscaping, drainage, or visibility splays to be in place. Starting before these are approved can put the permission at risk. Look for words like “prior to the commencement of development”.
Conditions that last. Others apply for the life of the development: obscure glazing in a side window, restricted opening hours, an occupancy condition on a farm dwelling, or the removal of permitted development rights.
The approved drawings. The permission is for what is shown on the stamped drawings listed in the notice. Building something different, even slightly, can be a breach.
If a condition is a problem
An application under section 54 of the Planning Act (Northern Ireland) 2011 can seek to vary or remove a condition. It is assessed on whether the condition is still needed. There is also a right of appeal against a condition, within the same time limit as other planning appeals.
If permission was refused
Each reason names a policy and the way the proposal fails it. Sort the reasons into two groups: those about principle (the site does not fit a route the policy allows) and those about detail (design, access, amenity). Detail reasons are often overcome with a revised scheme. Principle reasons are harder, and need a strong argument that the policy was misapplied.
Read the case officer’s report too. It shows how the council weighed each issue. Then decide, ideally with advice, between a revised application, a different proposal or an appeal to the Planning Appeals Commission. See refusals and appeals.
Building control is separate
Planning permission does not cover building regulations. Most building work also needs building control approval from the council, and that should be in place before work starts.