NI Planning Permission Ltd Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH 028 9591 6888 info@niplanningpermission.co.uk

Reading Your Planning Decision Notice: Conditions and Refusals

The decision notice is a legal document. It is worth reading every line of it before you celebrate, or despair.

By the planning team at Planning Permission Advice · reviewed 24 November 2026

If permission was granted

The time limit. The first condition usually sets the deadline to begin. For a full permission it is normally five years. For outline permission there are separate deadlines for reserved matters and for starting work.

Conditions to discharge before work starts. Some conditions require details to be submitted and approved before any work begins: materials, landscaping, drainage, or visibility splays to be in place. Starting before these are approved can put the permission at risk. Look for words like “prior to the commencement of development”.

Conditions that last. Others apply for the life of the development: obscure glazing in a side window, restricted opening hours, an occupancy condition on a farm dwelling, or the removal of permitted development rights.

The approved drawings. The permission is for what is shown on the stamped drawings listed in the notice. Building something different, even slightly, can be a breach.

If a condition is a problem

An application under section 54 of the Planning Act (Northern Ireland) 2011 can seek to vary or remove a condition. It is assessed on whether the condition is still needed. There is also a right of appeal against a condition, within the same time limit as other planning appeals.

If permission was refused

Each reason names a policy and the way the proposal fails it. Sort the reasons into two groups: those about principle (the site does not fit a route the policy allows) and those about detail (design, access, amenity). Detail reasons are often overcome with a revised scheme. Principle reasons are harder, and need a strong argument that the policy was misapplied.

Read the case officer’s report too. It shows how the council weighed each issue. Then decide, ideally with advice, between a revised application, a different proposal or an appeal to the Planning Appeals Commission. See refusals and appeals.

Building control is separate

Planning permission does not cover building regulations. Most building work also needs building control approval from the council, and that should be in place before work starts.

Have a question about your own site?

Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.

Not sure where you stand?

Tell us where the site is and what you would like to build or change. We will give you a straight answer on the planning position before you commit to anything.

☎ Ring us028 9591 6888 ✉ Emailinfo@ Ask usenquiry form