Key facts: Belfast
- Decided by
- Belfast City Council (planning pages)
- Planning office
- Planning Service, Cecil Ward Building, 4-10 Linenhall Street, Belfast BT2 8BP
- Where applications go
- the NI Planning Portal
- Plan in force
- Plan Strategy 2035, adopted May 2023 (checked 13 November 2026)
- Typical decision time
- 18.8 weeks (median, local applications, April–June 2026); 37.8% decided inside the 15-week target
The plan Belfast uses
Belfast City Council adopted its Plan Strategy 2035 on 2 May 2023, the second council in Northern Ireland to do so. The regional Planning Policy Statements no longer apply in the city. Its Local Policies Plan is still to come, so land-use zonings and most designations come from the Belfast Urban Area Plan 2001, with draft BMAP still a material consideration. Two pockets are different: land around Dunmurry is still covered by the Lisburn Area Plan 2001, and the Lagan Valley Regional Park Local Plan 2005 applies inside the park.
Policies that come up most
- RD2 for residential extensions and alterations, read with the design policies DES1 to DES4.
- HOU10 for HMOs. Inside a housing management area, HMOs and flats together should not exceed 20% of the dwellings in that area. Outside one, HMOs are capped at 10% of the dwellings on the street.
- HOU13 for short-term let accommodation, with tests on location, management and loss of permanent housing.
- BH1 to BH6 for listed buildings, conservation areas and areas of townscape character.
- DC1 to DC13 for the countryside on the city’s edge, including the Belfast Hills. DC7 (ribbon development) allows only one dwelling in a small gap within a frontage of three or more buildings.
Typical Belfast work
Most Belfast enquiries are about terraced and semi-detached houses: rear returns, loft dormers and side extensions where light and privacy for neighbours decide the outcome. We also see conversions of upper floors into flats, an HMO near the universities, short-term lets in the city centre, and alterations to buildings in conservation areas such as Malone, where permitted development rights are reduced (and in Malone Park and Adelaide Park, Article 4 directions remove more of them) and design is scrutinised closely.
The city’s Planning Service is based in the Cecil Ward Building on Linenhall Street. Applications go in through the NI Planning Portal.
Decision times in Belfast, in numbers
Between April and June 2026 the council issued 278 decisions on local applications, and 95% of those were approvals. Half of them took longer than 18.8 weeks from a valid application (a year earlier the figure was 13.6 weeks, and for 2025/26 as a whole it was 18.1). These are Department for Infrastructure figures and describe all local applications, not any one type.
Source: DfI Northern Ireland planning statistics, April–June 2026 bulletin.
What happens when you get in touch
- You send the address
A postcode or a pin on a map is enough, with a line on what you want to do.
- We look it up
Planning history, the plan that applies, and anything on or near the site that could matter.
- You get a straight answer
Whether it needs permission, how strong it looks, and what would help.
- If you go ahead
We can prepare the drawings, reports and forms and lodge the application for you.
- Until the decision
We answer the case officer and consultees and tell you what is happening.
Planning advice in Belfast
Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.