Planning Permission Questions, Answered Plainly

The questions we hear most often on the phone, with short answers. Every site is different, so treat these as a starting point rather than advice on your own case.

How long does a planning decision take in Northern Ireland?

The target for local applications is 15 weeks, but in April to June 2026 the Northern Ireland median was 20 weeks, ranging from about 8 weeks in Fermanagh and Omagh to over 45 weeks in Newry, Mourne and Down. A complete application with the right reports is the best way to avoid extra delay.

What is the difference between outline and full permission?

Outline permission establishes the principle of development and leaves the details (access, appearance, landscaping, layout and scale) for a later reserved matters application. Full permission covers everything at once.

How long does planning permission last?

A full permission normally has to be started within five years. For outline permission, reserved matters usually have to be applied for within three years, and work must begin within five years of the outline or two years of the final reserved matters approval, whichever is later. The decision notice can set different periods.

Do I need planning permission for a garden room or shed?

Often not, if it meets the Class D limits: no more than 50% of the garden, no higher than 4m, eaves no higher than 2.5m within 2m of a boundary, and used only for a purpose incidental to the house. A bedroom, self-contained living space or a separate business is not an incidental use and needs permission. There are no permitted development rights within the curtilage of a listed building, and tighter limits apply in conservation areas and AONBs.

Can I build a house on my own land in the countryside?

Only if the site fits one of the recognised routes, such as a farm dwelling, a small gap site, a cluster, a replacement or a conversion. Owning the land does not create a right to build on it.

Do I need permission to convert my house into an HMO?

Yes. In Northern Ireland an HMO is outside the use classes, so the change needs planning permission. You will also need an HMO licence from the council, which is a separate process. The council cannot grant a licence if the use is a breach of planning control, so the planning position should be sorted out first.

Will my neighbours be told about my application?

Yes. The council notifies occupiers of neighbouring land and the application is published online. Anyone can comment, but the council can only weigh comments that raise planning issues.

Can a neighbour stop my application?

Not on their own. Objections are weighed if they raise material planning issues such as overlooking or road safety. A valid objection can lead to changes or a refusal, but the number of letters is not what decides it.

What happens if I build without permission?

The council can ask you to apply retrospectively or, if the work is unacceptable, take enforcement action. After five years without action, a breach may become immune, which you can confirm with a certificate of lawfulness.

Is planning permission the same as building control?

No. Planning decides whether a development is acceptable in principle and in its setting. Building control checks that it is built safely and to the building regulations. Many projects need both.

How much does a planning application cost?

The council fee is set by regulation and depends on the type of application. The Department for Infrastructure publishes the current figures. Professional costs for drawings and reports are separate and depend on the site.

Can I appeal against a refusal?

Yes, to the Planning Appeals Commission, within four months of receiving the decision. The Commission cannot extend that period. A revised application is often quicker where the problems are about design or detail.

Does the new local development plan apply to my site?

It depends on your council. Six councils have adopted a Plan Strategy and use their own policies. The other five still use the regional Planning Policy Statements and their older area plans.

Do I need an ecology survey?

Possibly. Many applications must include a biodiversity checklist, and if it suggests protected species or habitats could be affected, a survey by an ecologist will be needed. Bat surveys can only be done at certain times of year, so check early.

Can I start work before permission is granted?

You can, but at your own risk, and doing so is a breach until permission is granted. If the application is refused you may have to undo the work.

What is a certificate of lawfulness?

A formal decision by the council that an existing use or development is lawful (for example because it is immune after five years) or that a proposed one would be lawful without a planning application.

Didn’t find what you were looking for? Try our advice guides or ask us directly.

Ask your own question

Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.

Not sure where you stand?

Tell us where the site is and what you would like to build or change. We will give you a straight answer on the planning position before you commit to anything.

☎ Ring us028 9591 6888 ✉ Emailinfo@ Ask usenquiry form