Planning Advice in Mid Ulster

Mid Ulster is the one council that is not on the shared NI Planning Portal, and its draft Plan Strategy has been sent back for changes. Both points affect how an application is prepared here.

Key facts: Mid Ulster

Decided by
Mid Ulster District Council (planning pages)
Planning office
Planning Department, Dungannon Office, Circular Road, Dungannon BT71 6DT
Where applications go
Mid Ulster's own online planning system (the council is not on the regional Portal)
Plan in force
Draft Plan Strategy (2019) not adopted; area plans and the PPSs apply (checked 13 November 2026)
Typical decision time
18 weeks (median, local applications, April–June 2026); 42.4% decided inside the 15-week target

The plan in force

The council published a draft Plan Strategy in February 2019 and submitted it for examination in May 2021. On 27 August 2026 the Department for Infrastructure issued a direction under section 15 of the Planning Act requiring the draft to be modified, and no independent examination has taken place. Applications are decided against the Strategic Planning Policy Statement, the retained Planning Policy Statements and three area plans: the Cookstown Area Plan 2010, the Dungannon and South Tyrone Area Plan 2010 and the Magherafelt Area Plan 2015.

Policies that come up most

  • PPS 21 for houses in the countryside. Rural housing makes up a large share of the applications here.
  • PPS 7 Addendum Policy EXT 1 for extensions.
  • PPS 4 for business and industry, important given the district’s manufacturing base.
  • PPS 2 in the Sperrin Area of Outstanding Natural Beauty, and PPS 3 on access and roads.
  • For renewable energy, the Strategic Planning Policy Statement Edition 2 since December 2025.

Applying in Mid Ulster

Applications are made through the council’s own online planning service rather than the regional Portal, and planning histories are searched there too. The statutory fees are the same as everywhere else in Northern Ireland. We are used to both systems and will prepare the submission in the format Mid Ulster requires.

Approval rates here are high, at close to 99% of local decisions in April to June 2026. The main office for planning is in Dungannon, on Circular Road.

Decision times in Mid Ulster, in numbers

Between April and June 2026 the council issued 273 decisions on local applications, and 99% of those were approvals. Half of them took longer than 18 weeks from a valid application (a year earlier the figure was 19.2 weeks, and for 2025/26 as a whole it was 22.4). These are Department for Infrastructure figures and describe all local applications, not any one type.

Source: DfI Northern Ireland planning statistics, April–June 2026 bulletin.

What happens when you get in touch

  1. You send the address

    A postcode or a pin on a map is enough, with a line on what you want to do.

  2. We look it up

    Planning history, the plan that applies, and anything on or near the site that could matter.

  3. You get a straight answer

    Whether it needs permission, how strong it looks, and what would help.

  4. If you go ahead

    We can prepare the drawings, reports and forms and lodge the application for you.

  5. Until the decision

    We answer the case officer and consultees and tell you what is happening.

Planning advice in Mid Ulster

Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.

Not sure where you stand?

Tell us where the site is and what you would like to build or change. We will give you a straight answer on the planning position before you commit to anything.