By the planning team at Planning Permission Advice · reviewed 24 November 2026
Step 1: establish the facts
When was the work finished, or when did the use begin? Has it continued without a break? Did anyone ever apply, and was it refused? Was there a condition on an earlier permission that the work breaches? Gather dated evidence now, while people remember: photographs with dates, invoices, bank statements, rates bills and letters from neighbours or contractors.
Step 2: check whether it is now immune
In Northern Ireland the time limit for enforcement is five years, whatever the type of breach. For building work, the period runs from substantial completion. For a change of use, it runs from the start of the breach. After that, the council can no longer take enforcement action, unless it had already taken or tried to take action within that time.
Immunity is not automatic. The way to confirm it is a certificate of lawfulness of existing use or development under section 169 of the Planning Act (Northern Ireland) 2011. The council decides it on the evidence, so the quality of your records matters more than anything else.
Step 3: if it is not immune
A retrospective application under section 55 asks for permission for what is already there. The council assesses it against current policy as if the work were proposed now. If it would have been acceptable, permission is usually granted, sometimes with conditions. If not, changes such as obscure glazing, a lower roof or removal of part of the work may be needed to make it acceptable.
If the council has written to you
- Reply within the deadline, politely and factually.
- Say what you intend to do: apply, seek a certificate, or put the breach right.
- Ask for a reasonable timetable if you need time to prepare an application.
- If a formal enforcement notice is served, note the date it takes effect. Appeals against a notice must be made before then.
Listed buildings are different
Unauthorised works to a listed building are treated more seriously and are not covered by the same five-year limit. Take advice before doing anything else.
Our retrospective planning service covers all of these steps.
Have a question about your own site?
Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.