NI Planning Permission Ltd Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH 028 9591 6888 info@niplanningpermission.co.uk

Extensions, Lofts and Garden Rooms: Do You Need Permission?

A good share of home improvements in Northern Ireland need no application at all. The trick is knowing exactly where the line sits for your house, because one extra metre or the wrong roof shape can take a project over it.

When an application is needed

The Planning (General Permitted Development) Order (Northern Ireland) 2015 lets you carry out certain work to a house without applying, within set limits on depth, height, position and materials. Those rights are narrower, or missing, in these situations:

  • the house is a flat or a maisonette, which has no householder permitted development rights;
  • the property is listed, or within a conservation area or an area of outstanding natural beauty;
  • an earlier planning permission removed the rights by condition (common on newer estates);
  • the extension would go beyond a wall of the original house that faces a road and forms its front or side elevation;
  • the work is close to a boundary and higher than the limit for that position.

If any of those apply, or the proposal is simply bigger than the Order allows, you will need a full application. The Portal calls this a householder application. It is the same process as any other full application, with its own fee category.

In a conservation area or an area of outstanding natural beauty, a single-storey extension up to 4m high can still be permitted development, provided it does not go beyond the front or side wall. Loft and roof alterations have no permitted development rights in a conservation area.

Porches, garden rooms and sheds

A porch (Class C) can be permitted development if its ground area is no more than 3 sq m measured externally, it is no more than 3m high with a flat or mono-pitched roof or 3.5m with a dual-pitched roof, and it is not within 2m of a boundary with a road. Materials should be of similar appearance to the house.

A garden room, shed or other outbuilding (Class D) has to be for a purpose incidental to the enjoyment of the house. The usual limits are: buildings covering no more than 50% of the garden, excluding the original house; no higher than 4m; eaves no higher than 2.5m if within 2m of a boundary; not in front of a wall that faces a road and forms the principal or a side elevation; not within 3.5m of a road boundary opposite the rear wall; and no deck, balcony or veranda. It cannot be used as a dwelling. Tighter limits apply in a conservation area or an area of outstanding natural beauty, and there are no permitted development rights within the curtilage of a listed building unless listed building consent has been granted.

How the council judges an extension

The test depends on where you live. Where a council has adopted its Plan Strategy, its own extensions policy applies: Belfast uses policy RD2, for example, and Antrim and Newtownabbey uses DM 22. In the five districts still working under the regional policy statements, extensions are assessed under Policy EXT 1 of the PPS 7 Addendum. The wording varies, but the questions are much the same. Does the extension suit the scale and style of the house? Will neighbours lose light or privacy, or feel hemmed in? Is there enough garden and parking left?

Most refusals we see come down to overlooking from first-floor windows, a two-storey extension too close to a neighbour’s window, or a dormer that dominates the roof. These are design issues that can usually be solved on paper before an application goes in.

What we do for you

We check your house against the permitted development limits and tell you in writing whether you need to apply. If you do, we look at the design with you, suggest changes that answer the likely objections, and prepare and submit the application. Where certainty matters, for example before a sale, we can apply for a certificate of lawfulness instead.

Can I check permitted development myself?

You can read the Planning (General Permitted Development) Order (Northern Ireland) 2015, and the DfI householder guidance is a good start. The difficult part is applying the measurements to your own house and confirming that no condition or designation has removed the rights. If you want certainty, a certificate of lawfulness of proposed use or development gives you a formal answer.

Do I need permission for a loft conversion with a dormer?

Often, yes. Internal loft work on its own is not usually development, but a dormer changes the roof and is controlled by the permitted development limits. Front-facing dormers, raised ridges and anything in a conservation area are the usual triggers for an application.

Does building control approval cover planning?

No. Building control is about construction standards and safety, and it is run by the council's building control service. Planning is about whether the development is acceptable in that place. Many projects need both, and neither stands in for the other.

What happens when you get in touch

  1. You send the address

    A postcode or a pin on a map is enough, with a line on what you want to do.

  2. We look it up

    Planning history, the plan that applies, and anything on or near the site that could matter.

  3. You get a straight answer

    Whether it needs permission, how strong it looks, and what would help.

  4. If you go ahead

    We can prepare the drawings, reports and forms and lodge the application for you.

  5. Until the decision

    We answer the case officer and consultees and tell you what is happening.

Ask about your home project

Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.

Not sure where you stand?

Tell us where the site is and what you would like to build or change. We will give you a straight answer on the planning position before you commit to anything.

☎ Ring us028 9591 6888 ✉ Emailinfo@ Ask usenquiry form