NI Planning Permission Ltd Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH 028 9591 6888 info@niplanningpermission.co.uk

Planning Applications Prepared and Managed for You

An application that arrives complete, with the right reports and a clear planning case, is validated sooner and gives the case officer fewer reasons to say no.

What a complete application includes

The council will not start assessing a proposal until it has everything it needs. Missing items are the most common cause of early delay, so we put the whole package together before anything is submitted.

  • Drawings. A site location plan on an Ordnance Survey base, a block plan, and existing and proposed floor plans and elevations. We arrange these with the drawing technicians we work with, to the scale and level of detail the council expects.
  • Forms and ownership certificate. The correct application form on the NI Planning Portal (or Mid Ulster’s own system), with the ownership certificate and any neighbour notification details filled in properly.
  • Supporting reports. Depending on the site, this may include a design and access statement, a biodiversity checklist, a drainage assessment, a flood risk assessment, a tree survey or a heritage statement. We tell you at the start which ones your site is likely to need, and we arrange them with the specialists who prepare them.
  • The planning statement. A short, structured argument showing how the proposal meets each test in the relevant policy. This is where our time makes most difference.
  • The fee. The statutory fee is paid to the council when the application is submitted. Our own charges are separate, and we confirm them in writing before we begin.

After it goes in

Once the council validates the application it is publicised, neighbours are notified and consultees such as DfI Roads, NI Water and the Northern Ireland Environment Agency are asked for comments. We keep an eye on the public file, answer requests for more information, and respond to objections or consultee concerns with facts rather than argument.

If the case officer raises a problem, we will tell you straight away and suggest how to deal with it. Sometimes a small amendment is enough. Occasionally the better course is to withdraw and resubmit a revised scheme, and we will say so if we think that is the case.

Outline or full?

Outline permission settles whether the principle is acceptable and leaves the detail (access, appearance, landscaping, layout and scale) for a later reserved matters application. It is common for new houses in the countryside. A full application covers everything at once and suits extensions, conversions and most commercial work. We will recommend whichever route gives your site the best footing.

What happens when you get in touch

  1. You send the address

    A postcode or a pin on a map is enough, with a line on what you want to do.

  2. We look it up

    Planning history, the plan that applies, and anything on or near the site that could matter.

  3. You get a straight answer

    Whether it needs permission, how strong it looks, and what would help.

  4. If you go ahead

    We can prepare the drawings, reports and forms and lodge the application for you.

  5. Until the decision

    We answer the case officer and consultees and tell you what is happening.

Ask us to look at your application

Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.

Not sure where you stand?

Tell us where the site is and what you would like to build or change. We will give you a straight answer on the planning position before you commit to anything.

☎ Ring us028 9591 6888 ✉ Emailinfo@ Ask usenquiry form