Solar, Wind and Battery Storage Planning in Northern Ireland

The regional policy on renewable energy changed in December 2025. If you were advised on a solar or wind project before then, it is worth checking the position again.

What changed

The Department for Infrastructure published Edition 2 of the Strategic Planning Policy Statement on 11 December 2025. The review was limited to renewable and low carbon energy, and the old Planning Policy Statement 18 was cancelled on the same day. Renewable proposals anywhere in Northern Ireland are now considered against Edition 2, together with the council’s own development plan policies where it has adopted a Plan Strategy.

We are cautious about summarising the new policy in a few lines, because the detail matters for each site. What does not change is the range of issues the council will look at: landscape and visual impact, effects on neighbours, ecology, heritage, roads during construction and, for turbines, shadow flicker, noise and aviation.

Solar on homes and farms

Panels on the roof of a house are often permitted development, within limits on how far they project and with tighter rules for listed buildings and conservation areas. Ground-mounted arrays and larger installations on farm buildings are more likely to need an application. We check the permitted development position first, as it can save you an application altogether.

Solar farms, turbines and storage

Larger schemes need a full planning application and a range of technical reports. Grid connection is a separate process, but the timing of the two should be planned together. Wind and solar schemes of 5MW or more are major development. You must give the council a proposal of application notice at least 12 weeks before applying, hold a public event, run a project website for at least 28 days and submit a community consultation report with the application. Schemes of 30MW or more may be treated as regionally significant and decided by the Department for Infrastructure. Battery storage is not named in the current major-development schedule; a larger standalone scheme may still count as major development, so check early. We will tell you which category your scheme falls into and what that means for the programme.

What happens when you get in touch

  1. You send the address

    A postcode or a pin on a map is enough, with a line on what you want to do.

  2. We look it up

    Planning history, the plan that applies, and anything on or near the site that could matter.

  3. You get a straight answer

    Whether it needs permission, how strong it looks, and what would help.

  4. If you go ahead

    We can prepare the drawings, reports and forms and lodge the application for you.

  5. Until the decision

    We answer the case officer and consultees and tell you what is happening.

Ask about a renewable project

Give us the address and a sentence or two about what you have in mind. One of the planning team will come back to you, normally within one working day.

Not sure where you stand?

Tell us where the site is and what you would like to build or change. We will give you a straight answer on the planning position before you commit to anything.